July 2026

Newly completed franchise storefront interior in New York City ready for opening

Franchise Construction NYC: Permits, Cost, and Timeline Explained

Franchise construction in NYC is the process of converting a leased space into a location that meets both your franchisor’s brand prototype and New York City’s building, fire, and zoning codes. Most franchise buildouts are filed with the Department of Buildings as an Alteration application, take roughly three to six months from lease signing to

Franchise Construction NYC: Permits, Cost, and Timeline Explained Read More »

Overhead view of a NYC restaurant layout design showing zoned dining, kitchen, and bar areas

Restaurant Layout Design in NYC: How to Plan a Floor Plan That Works and Passes Inspection

Restaurant layout design is the process of planning how your dining room, kitchen, bar, restrooms, and service paths fit and flow inside your space.  A workable NYC layout usually splits the floor around 60% front-of-house (dining, bar, waiting, restrooms) and 40% back-of-house (kitchen, prep, storage), plans roughly 12 to 20 square feet per seat depending

Restaurant Layout Design in NYC: How to Plan a Floor Plan That Works and Passes Inspection Read More »

restaurant permits nyc guide built by bob

Restaurant Permits Required in NYC: The Complete Guide

Opening a restaurant in New York City means clearing four agencies, not one. The core restaurant permits NYC requires are a Department of Buildings (DOB) alteration permit for the buildout, a Food Service Establishment Permit from the Health Department (DOHMH), FDNY fire and cooking approvals, and, if you serve alcohol, a State Liquor Authority (SLA)

Restaurant Permits Required in NYC: The Complete Guide Read More »